09 Biotacker 17
This system applied in green building industry, requires a more specialized pose than knuckled, but the advantage is a better compacting screed around pipe so that more performing.
Properly installed according to the drawing through printed reticulation on the heat reflecting sheet of polyethylene placed over the extruded polystyrene slab (5 treaded).
System suitable for all residential constructions such as buildings, villas and cottages
Outline application is step 10 outside areas and step 15 inner areas.
The tube diameter is 17×2 choice PE Xa or PE-RT (both with evoH oxygen barrier).
Distribution you have to choice between simple manifold and group with reduction temperature (fixed point or with external probe control).
Concrete screed at least 45 mm. (above the knuckle of the slab), must be addict with superplasticizer
LA 45
Properly installed according to the drawing through printed reticulation on the heat reflecting sheet of polyethylene placed over the extruded polystyrene slab (5 treaded).
System suitable for all residential constructions such as buildings, villas and cottages
Outline application is step 10 outside areas and step 15 inner areas.
The tube diameter is 17×2 choice PE Xa or PE-RT (both with evoH oxygen barrier).
Distribution you have to choice between simple manifold and group with reduction temperature (fixed point or with external probe control).
Concrete screed at least 45 mm. (above the knuckle of the slab), must be addict with superplasticizer
LA 45